Anchor and Mooring Chain
 
 
Chain Cable Tensioner
 
BBE-Tensioner

Anchor Line Pretensioning :

After the anchors are deployed, the lines must be pretensioned for alignment. During the pretensioning phase, the anchors trip, penetrate, and may begin their burial. The line lengths to be hauled in measure a few tens of metres.

Pre-tension the Embedment Anchor for Offshore Mooring :

- Increase the Efficient in pretensioning by using Yo-Yo method.
- No need to use compliant and expensive pulling device on board.
- Economically and rapidly for pretension and relocation.
- The huge pulling force can be produced by the surge forces of sea waves “Heave Oh” action. Tension up to 1200 Tons.
 
Download PDF
 
Back
 
 
Copyright © BillBoard Engineering Co. Ltd. All Rights Reserved.